Northwest Oregon Road Conditions
Highways with no adverse conditions do not show up on this report.
Current Travel Conditions By Route
I-205: MP 8.29 to 9.23
I-205, West Linn
Commercial Vehicle Information
Informational only
- Details
- I-205 NB & SB MP 8.12 to MP 9.25 (West Linn) Effective March 13, 2023, this section of I-205 northbound and southbound will be restricted to 15 feet 00 inches in width at night between the hours of 10 PM & 5 AM. Loads over 15 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is May 5, 2023.
- Last Updated
- 5/03/2023 10:00 AM
I-205: MP 9.58 to 8.5
I-205, 1 mile North of Abernethy Bridge
Commercial Vehicle Information
Informational only
- Details
- I-205 SB MP 9.58 to MP 8.49 (West Linn) Effective May 8, 2023, this section of I-205 southbound will be restricted to 14 feet 00 inches in width Monday through Thursday night between the hours of 10 PM & 5 AM. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is May 10, 2023.
- Last Updated
- 5/03/2023 10:00 AM
I-205: MP 16.8
I-205, 1 mile North of Intersection with SE Johnson Creek Blvd
Commercial Vehicle Information
Informational only
- Details
- I-205 SB MP 16.80 (Portland) Effective May 12, 2023, this section of I-205 southbound will be restricted to 17 feet 00 inches in width Friday through Sunday nights between the hours of 8 PM & 6 AM. Loads over 17 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is May 14, 2023.
- Last Updated
- 5/03/2023 10:00 AM
I-205: MP 17.12
I-205, 1 mile North of Intersection with SE Johnson Creek Blvd
Commercial Vehicle Information
Informational only
- Details
- I-205 SB MP 17.12 (Portland) Effective May 12, 2023, this section of I-205 southbound will be restricted to 17 feet 00 inches in width Friday through Sunday nights between the hours of 8 PM & 6 AM. Loads over 17 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is May 14, 2023.
- Last Updated
- 5/03/2023 10:00 AM
I-205: MP 17.12 to 17.85
I-205, 1 mile North of Intersection with SE Johnson Creek Blvd
Commercial Vehicle Information
Informational only
- Details
- I-205 NB MP 17.10 to MP 17.90 (Portland) Effective May 12, 2023, this section of I-205 northbound will be restricted to 17 feet 00 inches in width Friday through Sunday nights between the hours of 8 PM & 6 AM. Loads over 17 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is May 14, 2023.
- Last Updated
- 5/03/2023 10:00 AM
I-405: MP 4.2
I-405, Interstate 5
Commercial Vehicle Information
Informational only
- Details
- I-405 SB on-ramp from I-5 SB (Portland) Effective May 10, 2023, the I-405 southbound on-ramp from I-5 southbound will be restricted to 14 feet 00 inches in width at night between the hours of 9 PM & 5:30 AM. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is May 11, 2023.
- Last Updated
- 5/03/2023 10:00 AM
I-405: MP 4.2
I-405, Interstate 5
Commercial Vehicle Information
Informational only
- Details
- I-405 SB on-ramp from I-5 SB (Portland) Effective May 11, 2023, the I-405 southbound on-ramp from I-5 southbound will be restricted to 16 feet 00 inches in width at night between the hours of 9 PM & 5:30 AM. Loads over 16 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is May 12, 2023.
- Last Updated
- 5/03/2023 10:00 AM
I-5: MP 282.91
I-5, 1 mile South of Wilsonville
Commercial Vehicle Information
Informational only
- Details
- I-5 NB MP 282.78 to MP 282.94 (Wilsonville) Effective May 19, 2023, this section of I-5 northbound will be restricted to 17 feet 00 inches in width at night between the hours of 8 PM and 6 AM. Loads over 17 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is May 20, 2023.
- Last Updated
- 5/03/2023 10:00 AM
I-5: MP 298.78
I-5, I-405 South Interchange
Commercial Vehicle Information
Informational only
- Details
- I-5 SB MP 298.53 to MP 298.33 (Portland) Effective July 7, 2023, this section of I-5 southbound will be intermittently restricted to 18 feet 00 inches in width at night between the hours of 8 PM & 5 AM. Loads over 18 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is July 9, 2023.
- Last Updated
- 5/03/2023 10:00 AM
I-5: MP 298.78
I-5, I-405 South Interchange
Commercial Vehicle Information
Informational only
- Details
- I-5 NB & SB MP 298.33 to MP 298.53 (Portland) Effective July 17, 2023, this section of I-5 northbound and southbound will be intermittently restricted to 18 feet 00 inches in width at night between the hours of 9 PM & 5 AM. Loads over 18 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is July 19, 2023.
- Last Updated
- 5/03/2023 10:00 AM
I-5: MP 300.94 to 300.03
I-5, Interstate 84
Commercial Vehicle Information
Informational only
- Details
- I-5 SB MP 301.00 to MP 300.00 Portland) Effective July 7, 2023, this section of I-5 southbound will be closed at night between the hours of 10 PM & 6 AM. The estimated completion date for this work is July 9, 2023.
- Last Updated
- 5/03/2023 10:00 AM
I-84: MP 5.69
I-84, 1 mile East of Portland, Intersection with 82nd Ave
Commercial Vehicle Information
Informational only
- Details
- I-84 EB Exit 7 off-ramp to Halsey St (Portland) Effective October 18, 2022, the I-84 eastbound Exit 7 off-ramp to Halsey Street will be intermittently restricted to 14 feet 00 inches in width at all hours. Loads over 14 feet 00 inches in width will be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is August 3, 2023.
- Last Updated
- 5/03/2023 10:00 AM
I-84: MP 5.74 to 5.76
I-84, 1 mile East of Portland, Intersection with 82nd Ave
Commercial Vehicle Information
Informational only
- Details
- I-84 EB MP 5.74 to MP 5.76 (Portland) Effective May 21, 2023, this section of I-84 eastbound will be intermittently restricted to 17 feet 11 inches in height Sunday through Thursday nights between the hours of 8 PM & 5 AM. Friday nights between the hours of 8 PM & 8 AM. Saturday nights between the hours of 7 PM & 8:30 AM. Loads over 17 feet 11 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is July 22, 2023.
- Last Updated
- 5/03/2023 10:00 AM
I-84: MP 6.74
I-84, Interstate 205
Commercial Vehicle Information
Informational only
- Details
- I-84 WB MP 6.74 (Portland) Effective May 21, 2023, this section of I-84 westbound will be intermittently restricted to 15 feet 1 inch in height Sunday through Thursday nights between the hours of 8 PM & 5 AM. Friday nights between the hours of 8 PM & 8 AM. Saturday nights between the hours of 7 PM & 8:30 AM. Loads over 15 feet 1 inch in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is July 22, 2023.
- Last Updated
- 5/03/2023 10:00 AM
I-84: MP 13.03 to 77
Snow Zone
Informational only
- Affected Area
- NE 181st in Troutdale east to just west of the Rowena Exit
- Minimum Chain Restriction
- Carry chains or traction tires regardless of conditions. View more information on Chain Laws.
I-84: MP 16.55
I-84, Troutdale
Commercial Vehicle Information
Informational only
- Details
- I-84 WB MP 16.55 (Troutdale) Effective March 16, 2023, this section of I-84 westbound will be intermittently restricted to 16 feet 11 inches in height Monday through Thursday nights between the hours of 8 PM & 5 AM, Friday nights between the hours of 8:30 PM & 8 AM, Saturday nights between the hours of 8:30 PM & 8:30 AM, and Sunday nights between the hours of 9 PM & 5 AM. Loads over 16 feet 11 inches in height may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is June 30, 2023.
- Last Updated
- 5/03/2023 10:00 AM
I-84: MP 35.14 to 45.33
I-84, 4 miles East of Multnomah Falls
Commercial Vehicle Information
Informational only
- Details
- I-84 EB & WB MP 31.77 to MP 46.00 (Cascade Locks) Effective April 2, 2023, this section of I-84 eastbound and westbound will be intermittently restricted to 12 feet 00 inches in width, nightly 7pm to 7am, Sunday night to Thursday morning. Loads over 12 feet 00 inches in width will be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is June 15, 2023.
- Last Updated
- 5/03/2023 10:00 AM
I-84: MP 40.14 to 40.27
I-84, 5 miles West of Cascade Locks
Commercial Vehicle Information
Informational only
- Details
- I-84 EB MP 39.00 to MP 40.27 (Cascade Locks) Effective May 14, 2023, this section of I-84 eastbound will be restricted to 9 feet 00 inches in width Sundays at 5 PM through Thursdays at 4 PM. The estimated completion date for this work is May 18, 2023.
- Last Updated
- 5/03/2023 10:00 AM
I-84: MP 40.57 to 40.18
I-84, 4 miles West of Cascade Locks
Commercial Vehicle Information
Informational only
- Details
- I-84 WB MP 39.00 to MP 41.00 (Cascade Locks) Effective May 7, 2023, this section of I-84 westbound will be restricted to 9 feet 00 inches in width Sundays at 5 PM through Thursdays at 4 PM. The estimated completion date for this work is May 11, 2023.
- Last Updated
- 5/03/2023 10:00 AM
I-84: MP 41.25 to 44.65
I-84, 4 miles West of Cascade Locks
Commercial Vehicle Information
Informational only
- Details
- I-84 EB MP 40.50 to MP 44.65 (Cascade Locks) Effective March 19, 2023, this section of I-84 eastbound will be restricted to 9 feet 00 inches in width Sundays at 5 PM through Thursdays at 4 PM. The estimated completion date for this work is May 25, 2023.
- Last Updated
- 5/03/2023 10:00 AM
I-84: MP 41.25
I-84, 4 miles West of Cascade Locks
Commercial Vehicle Information
Informational only
- Details
- I-84 EB MP 41.25 (Tooth Rock Tunnel - Cascade Locks) Effective March 19, 2023, this section of I-84 eastbound will be restricted to 14 feet 6 inches in height Sundays at 5 PM through Thursdays at 4 PM. The estimated completion date for this work is May 25, 2023.
- Last Updated
- 5/03/2023 10:00 AM
I-84: MP 43.11 to 44.4
I-84, 2 miles West of Cascade Locks
Commercial Vehicle Information
Informational only
- Details
- I-84 WB MP 43.00 to MP 44.50 (Cascade Locks) Effective May 7, 2023, this section of I-84 westbound will be restricted to 9 feet 00 inches in width Sundays at 5 PM through Thursdays at 4 PM. The estimated completion date for this work is May 11, 2023.
- Last Updated
- 5/03/2023 10:00 AM
I-84: MP 54.77 to 58.59
I-84, 9 miles West of Hood River
Commercial Vehicle Information
Informational only
- Details
- I-84 EB MP 53.70 to MP 58.60 (Hood River) Effective March 1, 2023, this section of I-84 eastbound will be restricted to 16 feet 00 inches in width at all hours. The estimated completion date for this work is May 12, 2023.
- Last Updated
- 5/03/2023 10:00 AM
I-84: MP 54.77 to 58.59
I-84, 9 miles West of Hood River
Commercial Vehicle Information
Informational only
- Details
- I-84 EB MP 53.70 to MP 58.60 (Hood River) Effective May 12, 2023, this section of I-84 eastbound will be restricted to 16 feet 00 inches in width Monday through Thursday during daylight hours only, half an hour before sunrise to half an hour after sunset. Loads over 16 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is October 2, 2023.
- Last Updated
- 5/03/2023 10:00 AM
US101: MP 0 to 3.33
US101, Oregon - Washington Border
Commercial Vehicle Information
Informational only
- Details
- US101 MP 0.00 to MP 3.33 (Astoria-Megler/Columbia River Bridge - Astoria) Effective September 19, 2021, US101 crossing the Astoria-Megler/Columbia River Bridge is restricted to the following weights for non-divisible loads: 21,500 lbs. single axle, 43,000 lbs. tandem axle, 204,800 lbs. GVW, other group axle weights shown in Weight Table 4; 24,000 lbs. single axle, 48,000 lbs. tandem axle, 174,400 GVW, other group axle weights shows in Weight Table 5 (requires minimum of 9 axles and 4 consecutive sets of tandem axles to qualify for Weight Table 5). The estimated completion date for this project is November 30, 2024.
- Last Updated
- 5/03/2023 10:00 AM
US101: NB MP 66.25 to 65.69
US101, Intersection with Wilson River Highway ORE6
Information
Future Event: Estimated delay under 20 minutes
- Expected Start Date
- 6/24/2023 11:00:00 AM
- Comments
- A special event is taking place. Prepare to slow. Route will start at Tillamook Bay Community College going southbound on Marolf loop road, westbound on 12th street, north on Miller avenue, westbound on 11th street, northbound on highway 101, eastbound on highway 6/1st street, southbound on highway 101, eastbound on highway 6, continue on 3rd street ending at Goodspeed park.
- Last Updated
- 4/07/2023 7:26 PM
US101: MP 98.85 to 104.2
Snow Zone
Informational only
- Affected Area
- Cascade Head - just north of Neskowin Creek to just north of the Salmon River
- Minimum Chain Restriction
- Carry chains or traction tires regardless of conditions. View more information on Chain Laws.
US26: WB MP 0.3 to 11
US26, Intersection with Oregon Coast Highway US101
Construction Work
No to Minimum Delay
- Comments
- Road construction is occurring causing minimal delay to traffic. Use caution and watch for workers.
- Last Updated
- 5/02/2023 12:23 PM
US26: MP 0.37 to 0.94
US26, I-405
Commercial Vehicle Information
Informational only
- Details
- US26 EB & WB MP 0.37 to MP 0.94 (Ross Island Bridge - Portland) Effective June 6, 2023, this section of US26 eastbound and westbound will be restricted to 8 feet 6 inches in width Tuesday through Thursday nights between the hours of 10 PM & 5 AM, for bridge inspections. The estimated completion date for this work is June 9, 2023.
- Last Updated
- 5/03/2023 10:00 AM
US26: MP 9.72 to 35.11
Snow Zone
Informational only
- Affected Area
- David Douglas (Elev. 1642') - East of Necanicum Jct to Sand Shed near North Fork Wolf Creek Rd
- Minimum Chain Restriction
- Carry chains or traction tires regardless of conditions. View more information on Chain Laws.
US26: MP 25.12 to 42.5
Snow Zone
Informational only
- Affected Area
- Sandy to Zigzag
- Minimum Chain Restriction
- Carry chains or traction tires regardless of conditions. View more information on Chain Laws.
US26: MP 37.73 to 45.43
Snow Zone
Informational only
- Affected Area
- Sunset Summit (Elev. 1174') - Timber Jct to Nehalem Hwy
- Minimum Chain Restriction
- Carry chains or traction tires regardless of conditions. View more information on Chain Laws.
US26: MP 59.57 to 75.5
Snow Zone
Informational only
- Affected Area
- Blue Box Pass (Elev. 4025') & Warm Springs Jct - OR35 Jct to Warm Springs Jct
- Minimum Chain Restriction
- Carry chains or traction tires regardless of conditions. View more information on Chain Laws.
US30: MP 11.93
HWY100, 5 miles East of Corbett
Commercial Vehicle Information
Informational only
- Details
- US30 (Historic Columbia River Hwy) MP 11.93 (Latourell Creek Bridge - east of Corbett) Effective June 18, 2020, US30 (Historic Columbia River Hwy) crossing Latourell Creek Bridge at MP 11.93 is restricted to the following weights: 27 tons for SU5 (5 axle single-unit truck); 28 tons for SU6 & SU7 vehicles (6 and 7 axle single-unit trucks).
- Last Updated
- 5/03/2023 10:00 AM
US30: MP 23.15
US30, 2 miles East of Warren
Commercial Vehicle Information
Informational only
- Details
- US30 MP 23.15 (Honeyman Creek Bridge - west of Scappoose) Effective June 9, 2020, US30 crossing the Honeyman Creek Bridge at MP 23.15 is restricted to 16 tons on the inside and center lanes. Loads exceeding 16 tons must use the right lane on the bridge when crossing.
- Last Updated
- 5/03/2023 10:00 AM
US30: MP 48.31 to 61.01
Snow Zone
Informational only
- Affected Area
- Rainier to Clatskanie
- Minimum Chain Restriction
- Carry chains or traction tires regardless of conditions. View more information on Chain Laws.
US30: MP 72.32 to 76.76
Snow Zone
Informational only
- Affected Area
- Bradley Hill (Clatsop Crest Summit Elev. 655') - just east of Driscoll Slough Road to west of Shingle Mill Rd
- Minimum Chain Restriction
- Carry chains or traction tires regardless of conditions. View more information on Chain Laws.
ORE153: MP 5.88
ORE153, Amity
Commercial Vehicle Information
Informational only
- Details
- OR153 (Bellevue-Hopewell Hwy) MP 5.88 (Salt Creek Bridge - west of Amity) Effective June 18, 2020, OR153 crossing Salt Creek (Ash Swale) Bridge at MP 5.88 is restricted to 9 tons for all vehicles.
- Last Updated
- 5/03/2023 10:00 AM
ORE153: MP 5.88
ORE153, Amity
Commercial Vehicle Information
Informational only
- Details
- OR153 EB & WB MP 5.88 (Salt Creek Bridge - Amity) Effective May 31, 2022, this section of OR153 eastbound and westbound will be closed at all hours. The estimated completion date for this project is September 15, 2023.
- Last Updated
- 5/03/2023 10:00 AM
ORE173: MP 0.12 to 5.49
Snow Zone
Informational only
- Affected Area
- Timberline - US26/Government Camp to Timberline Lodge
- Minimum Chain Restriction
- Carry chains or traction tires regardless of conditions. View more information on Chain Laws.
ORE18: MP 12 to 18
Snow Zone
Informational only
- Affected Area
- Van Duzer Corridor - (Murphy Hill Summit Elev. 760') Just west of Bear Creek thru the Van Duzer Corridor
- Minimum Chain Restriction
- Carry chains or traction tires regardless of conditions. View more information on Chain Laws.
ORE217: MP 2.26 to 2.7
ORE217, 2 miles South of US 26
Commercial Vehicle Information
Informational only
- Details
- OR217 SB Exit 2B on- and off-ramps to/from Allen Blvd (Beaverton) Effective January 1, 2022, the OR217 southbound Exit 2B on- and off-ramps to/from Allen Boulevard will be intermittently restricted to 14 feet 00 inches in width at all hours. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is July 6, 2023.
- Last Updated
- 5/03/2023 10:00 AM
ORE217: MP 2.78 to 3.26
ORE217, 3 miles South of US 26
Commercial Vehicle Information
Informational only
- Details
- OR217 SB Exit 3 on- and off-ramps to/from Denney Rd (Beaverton) Effective May 19, 2022, the OR217 southbound Exit 3 on- and off-ramps to/from Denney Road will be intermittently restricted to 14 feet 00 inches in width at all hours. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is May 1, 2023.
- Last Updated
- 5/03/2023 10:00 AM
ORE217: MP 3.56
ORE217, 4 miles South of US 26
Commercial Vehicle Information
Informational only
- Details
- OR217 SB Exit 4A off-ramp to Hall Blvd (Beaverton) Effective January 24, 2022, the OR217 southbound Exit 4A off-ramp to Hall Boulevard will be intermittently restricted to 13 feet 00 inches in width at all hours. Loads over 13 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is March 31, 2023.
- Last Updated
- 5/03/2023 10:00 AM
ORE217: MP 3.83
ORE217, 4 miles South of US 26
Commercial Vehicle Information
Informational only
- Details
- OR217 SB on-ramp from Hall Blvd (Beaverton) Effective January 19, 2022, the OR217 southbound on-ramp from Hall Boulevard will be intermittently restricted to 14 feet 00 inches in width at all hours. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is July 31, 2023.
- Last Updated
- 5/03/2023 10:00 AM
ORE217: MP 4.12 to 4.51
ORE217, 4 miles South of US 26
Commercial Vehicle Information
Informational only
- Details
- OR217 SB Exit 4B on- and off-ramps to/from OR210/Scholls Ferry Rd (Beaverton) Effective January 19, 2022, the OR217 southbound Exit 4B on- and off-ramps to/from OR210/Scholls Ferry Road will be intermittently restricted to 14 feet 00 inches in width at all hours. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is July 31, 2023.
- Last Updated
- 5/03/2023 10:00 AM
ORE217: MP 4.78 to 5.17
ORE217, 5 miles South of US 26
Commercial Vehicle Information
Informational only
- Details
- OR217 SB on-ramp from Greenburg Rd (Beaverton) Effective January 26, 2022, the OR217 southbound on-ramp from Greenburg Road will be intermittently restricted to 14 feet 00 inches in width at all hours. Loads over 14 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this project is July 31, 2023.
- Last Updated
- 5/03/2023 10:00 AM
ORE217: MP 5.13
ORE217, 5 miles South of US 26
Commercial Vehicle Information
Informational only
- Details
- OR217 NB Exit 5 off-ramp to Greenburg Rd (Tigard) Effective November 4, 2022, the OR217 northbound Exit 5 off-ramp to Greenburg Road will be restricted to 14 feet 00 inches in width at all hours. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. The estimated completion date for this work is May 4, 2023.
- Last Updated
- 5/03/2023 10:00 AM
ORE217: MP 5.69
ORE217, 6 miles South of US 26
Commercial Vehicle Information
Informational only
- Details
- OR217 SB Exit 6 off-ramp to OR99W (Tigard) Effective November 4, 2022, the OR217 southbound Exit 6 off-ramp to OR99W will be restricted to 14 feet 00 inches in width at all hours. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. The estimated completion date for this work is May 4, 2023.
- Last Updated
- 5/03/2023 10:00 AM
ORE22: MP 32 to 73
Snow Zone
Informational only
- Affected Area
- Gates City Limit to Marion Forks
- Minimum Chain Restriction
- Carry chains or traction tires regardless of conditions. View more information on Chain Laws.
ORE224: MP 49.911
ORE224, Ripplebrook Ranger Station
Commercial Vehicle Information
Informational only
- Details
- OR224 MP 49.91 (Clackamas River Bridge - Ripplebrook) Effective October 28, 2019, OR224 crossing Clackamas River Bridge at MP 49.91 is restricted to the following weights: 28 tons for SU5 and SU6 vehicles (5 and 6 axle single-unit trucks); 29 tons for SU7 (7 axle single-unit trucks).
- Last Updated
- 5/03/2023 10:00 AM
ORE35: MP 60 to 83.56
Snow Zone
Informational only
- Affected Area
- White River - Jct US26 to ODOT Maintenance Station
- Minimum Chain Restriction
- Carry chains or traction tires regardless of conditions. View more information on Chain Laws.
ORE43: MP 11.14 to 11.43
ORE43, Interstate 205
Commercial Vehicle Information
Informational only
- Details
- OR43 SB MP 11.14 to MP 11.46 (West Linn) Effective May 30, 2023, this section of OR43 southbound will be restricted to 18 feet 00 inches in width at all hours. Loads over 18 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is June 21, 2023.
- Last Updated
- 5/03/2023 10:00 AM
ORE47: MP 0 to 11.71
Snow Zone
Informational only
- Affected Area
- OR202 Jct - (Clatskanie Mountain Summit Elev. 1347') Clatskanie to Mist
- Minimum Chain Restriction
- Carry chains or traction tires regardless of conditions. View more information on Chain Laws.
ORE47: MP 88.05
ORE47, 1 mile North of Forest Grove
Commercial Vehicle Information
Informational only
- Details
- OR47 MP 88.05 NB & SB (Forest Grove) Effective September 27, 2016, this section of OR47 northbound and southbound is restricted to 14 feet 00 inches in width and/or 135 feet 00 inches in overall length. Mobile homes with eaves are allowed provided the base width does not exceed 14 feet 00 inches in width. Loads wider than 14 feet and/or 135 feet overall length may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information.
- Last Updated
- 5/03/2023 10:00 AM
ORE53: MP 17.76
ORE53, 1 mile North of Intersection with Oregon Coast Highway US101
Commercial Vehicle Information
Informational only
- Details
- OR53 MP 17.76 NB & SB (Nehalem River Bridge - Nehalem) Effective May 27, 2021, OR53 crossing Nehalem River Bridge is restricted to 20,000 single axle, 34,000 lbs. tandem axle, 105,500 lbs. GVW, Weight Table 2 for combinations; 34 tons for SU7 (7 axle single-unit trucks).
- Last Updated
- 5/03/2023 10:00 AM
ORE6: MP 16.06 to 37.5
Snow Zone
Informational only
- Affected Area
- Wilson River Summit (Elev. 1610') - Jordan Creek to Timber Jct.
- Minimum Chain Restriction
- Carry chains or traction tires regardless of conditions. View more information on Chain Laws.
ORE8: MP 2.65 to 3.6
ORE8, Highway 217
Commercial Vehicle Information
Informational only
- Details
- OR8 EB & WB MP 2.67 to MP 3.60 (Beaverton) Effective August 15, 2022, this section of OR8 (Tualatin Valley Highway) will be restricted to 10 feet 00 inches in width Monday through Friday nights between the hours of 8:00 PM and 5:00 AM. Loads over 10 feet 00 inches in width may be accommodated on a case-by-case basis. Contact the Over-Dimension Permit Unit for information. The estimated completion date for this work is May 31, 2023.
- Last Updated
- 5/03/2023 10:00 AM
ORE99: MP -0.36
ORE99W, Portland
Commercial Vehicle Information
Informational only
- Details
- OR99W MP -0.36 (Steel Bridge - Portland) Effective October 28, 2019, OR99W crossing the Steel Bridge in Portland is restricted to the following weights: 20,000 lbs. single axle, 34,000 lbs. tandem axle, Weight Table 2 & for Non-Divisible Loads 21,500 lbs. single axle, 43,000 lbs. tandem axle, 98,000 lbs. GVW, Weight Table 3.
- Last Updated
- 5/03/2023 10:00 AM
ORE99: MP 1.41
ORE99W, I-405 South Interchange
Commercial Vehicle Information
Informational only
- Details
- OR99W (Pacific Hwy) MP 1.41 (Arthur Street Bridge - Portland) OR99W crossing Arthur Street Bridge at MP 1.41 is restricted to the following weights: 33 tons for SU6 (6 axle single-unit trucks); and 34 tons for SU7 (7 axle single-unit trucks).
- Last Updated
- 5/03/2023 10:00 AM